PGE

Another new subcontractor replacing a power pole a couple of guys digging the hole by hand ? Two and a half days with a roto hammer and shovels in this heat and smoke . They did have a pop up shade cover over the hole they have done several over the last few weeks . Whatever happened to a auger ? maybe its time and material ? its always a new company inspection / tree trimming / line and pole repairs my transformer pole and trees have been inspected at least six times this year . Another rate increase coming with all these brand new trucks driving around . My rant for today and my power was out the other day all day while they replaced another pole lol .
24 solar world 285 watt panels with 24 Enphase 250 s ground mount grid tied .
Comments
http://members.sti.net/offgridsolar/
E-mail [email protected]
http://members.sti.net/offgridsolar/
E-mail [email protected]
Some of it is going to be underground but not much. At this rate it will be 1000 years before it is all done, says WIKI. We have had a crew stop by the house. They use us as a waypoint to get where they are going. They are respectful and do not get to close. They have landed up our road in an emergency a few years back. Good Guy's ! Below is not them BTW.
http://members.sti.net/offgridsolar/
E-mail [email protected]
Take a drive on hwy 88 where the Caldor fire almost burned to Lake Tahoe last summer. The scope of the fire damage and the 95% that is overgrown and untouched shows how it has been neglected. When the Timber and Ranching industries were stopped, it all just kept growing. The Feds have alot of blame but California is the deep pocket.
A Forester who I know said it has taken 40 years of the clean air act, endangered species act and another I can't remember to get California to this point. He said if they do all the funding for what needs to be done, it could take 40 years to fix it!
His name is John xxxxx and the book was "Torching Conventional Forestry."
http://members.sti.net/offgridsolar/
E-mail [email protected]