Battery based system drafting service for permit applications
SanghaEnergy
Registered Users Posts: 1 ✭
We are in need of a design and drafting service for battery based PV installs both on and off grid. We have done out own drawings for years but not that things are getting cookie cutter the grid-tie drafting services and way faster and cheaper. Problem is the battery based systems - we have yet to find a service that provides them fast, cheap and high quality.
Let me know who you use. Plus for the offgridders - we really need to start moving everyone to some standards - how in the world will anyone be able to maintain this hodgepodge of custom one off design after I (we) retire?
Let me know who you use. Plus for the offgridders - we really need to start moving everyone to some standards - how in the world will anyone be able to maintain this hodgepodge of custom one off design after I (we) retire?
Tagged:
Comments
-
i use MS Visio. but you can make models in google DRAW and use that too.
Powerfab top of pole PV mount | Listeroid 6/1 w/st5 gen head | XW6048 inverter/chgr | Iota 48V/15A charger | Morningstar 60A MPPT | 48V, 800A NiFe Battery (in series)| 15, Evergreen 205w "12V" PV array on pole | Midnight ePanel | Grundfos 10 SO5-9 with 3 wire Franklin Electric motor (1/2hp 240V 1ph ) on a timer for 3 hr noontime run - Runs off PV ||
|| Midnight Classic 200 | 10, Evergreen 200w in a 160VOC array ||
|| VEC1093 12V Charger | Maha C401 aa/aaa Charger | SureSine | Sunsaver MPPT 15A
solar: http://tinyurl.com/LMR-Solar
gen: http://tinyurl.com/LMR-Lister , -
off grid plans are still a grey area... as there is no 'bubble'-market for off gridders unlike the grid-tied people who don't yet realize they are in a bubble... the only reason grid-tied plans are so easy to get through is because of the nationwide gridtied solar bubble...
grid tied is for the masses... off grid takes about 9000% more responsiblity, planning, maitenance, etc.. reletavley few are off grid... thus the permit proess is still grey due to lack of people off grid..... mah 2 centz
~1.5Kw PV in parallel
Morningstar MPPT-60 controllers (2) in parallel
3 Trojan tr-1275's in parallel 450ah total
Samlex 2,000 watt 12-volt inverter hardwired -
IMHO it is impossible to standardize while using low voltage car batteries. There are too many steps to getting to high output, and corners that are tempting to cut.
Hopefully the introduction of high voltage home batteries will bring some standards to the market. And smaller components. (Higher voltage can carry the same POWER across a much thinner wire).
From what I have seen old-school-ers will fight it, but there's no denying that high voltage batteries are the right way to design home systems. -
I did my drawings in LibreOffice Draw (open source variant of Visio)
Categories
- All Categories
- 222 Forum & Website
- 130 Solar Forum News and Announcements
- 1.3K Solar News, Reviews, & Product Announcements
- 190 Solar Information links & sources, event announcements
- 886 Solar Product Reviews & Opinions
- 254 Solar Skeptics, Hype, & Scams Corner
- 22.3K Solar Electric Power, Wind Power & Balance of System
- 3.5K General Solar Power Topics
- 6.7K Solar Beginners Corner
- 1K PV Installers Forum - NEC, Wiring, Installation
- 2K Advanced Solar Electric Technical Forum
- 5.5K Off Grid Solar & Battery Systems
- 424 Caravan, Recreational Vehicle, and Marine Power Systems
- 1.1K Grid Tie and Grid Interactive Systems
- 651 Solar Water Pumping
- 815 Wind Power Generation
- 621 Energy Use & Conservation
- 608 Discussion Forums/Café
- 302 In the Weeds--Member's Choice
- 74 Construction
- 124 New Battery Technologies
- 108 Old Battery Tech Discussions
- 3.8K Solar News - Automatic Feed
- 3.8K Solar Energy News RSS Feed