KC 120s question
 
            
                
                    Chuck46                
                
                    Solar Expert Posts: 95 ✭                
            
                        
            
                    Does anyone know who to contact on the KC 120s when they start under producing?
Thanks
Chuck
                        
        
        
      Thanks
Chuck
Comments
- 
            Re: KC 120s question
 read this thread, last post is full contact information including email address's
 http://www.solar-guppy.com/forum/kyocera-kc-120-panel-failure-t233.html?hilit=KC120
- 
            Re: KC 120s question
 Thanks lots Solar Guppy Thats what I needed.
 Chuck
- 
            Re: KC 120s question
 So what do you think?
 KC 120-1 Pannel Temp. 32.7C
 Full solar noon sun on panels
 6 pannels measued 15.40 to 15.92 volts
 6 pannels measured 7.52 to 7.96 volts
 array open circuit voltage 19.43
 This system is wired siries parrallel for a battery voltage of 24 volts. Any opiniions.
 Thanks Chuck
- 
            Re: KC 120s question
 Sounds like some of the panels are bad--if you look closely, you may see some dark/burned areas through the glass.
 From what I have heard, they will replace the entire set (and may also give you some money for labor too). No reason not to contact them and get the process started.
 -BillNear San Francisco California: 3.5kWatt Grid Tied Solar power system+small backup genset
- 
            Re: KC 120s question
 Thanks BB I just faxed the RA into them and am awaiting the results. I looked at the front of the pannels but with my old eyes didnt see anything. I figgure that volt meter dont lie if you got a good one:D
 Thanks Chuck
- 
            Re: KC 120s questionI figgure that volt meter dont lie if you got a good one:D
 I will add that we have once or twice here chased problems that did not make sense when a DVM seemed OK at some voltage/currents and looked "sort of OK if there was a problem" at others...
 Given that these panels are most likely bad (bad production lot)--you don't have much risk here...
 But if you ever get into debugging and certain readings don't make sense--getting/borrowing a second meter (or calibrating/checking your current meter) is worth the money/time.
 -BillNear San Francisco California: 3.5kWatt Grid Tied Solar power system+small backup genset
- 
            Re: KC 120s questionSounds like some of the panels are bad--if you look closely, you may see some dark/burned areas through the glass.
 From what I have heard, they will replace the entire set (and may also give you some money for labor too). No reason not to contact them and get the process started.
 -Bill
 This was my experience. Replacement was finished just 2 days ago. I live out in the sticks, and just happen to have a Solar Install company a few miles away. My replacement set (60) was refurbished KC-120s, I heard som others were getting KC-135s a while back.
Categories
- All Categories
- 232 Forum & Website
- 140 Solar Forum News and Announcements
- 1.4K Solar News, Reviews, & Product Announcements
- 199 Solar Information links & sources, event announcements
- 899 Solar Product Reviews & Opinions
- 256 Solar Skeptics, Hype, & Scams Corner
- 22.5K Solar Electric Power, Wind Power & Balance of System
- 3.5K General Solar Power Topics
- 6.7K Solar Beginners Corner
- 1K PV Installers Forum - NEC, Wiring, Installation
- 2.1K Advanced Solar Electric Technical Forum
- 5.6K Off Grid Solar & Battery Systems
- 428 Caravan, Recreational Vehicle, and Marine Power Systems
- 1.1K Grid Tie and Grid Interactive Systems
- 655 Solar Water Pumping
- 816 Wind Power Generation
- 624 Energy Use & Conservation
- 620 Discussion Forums/Café
- 313 In the Weeds--Member's Choice
- 75 Construction
- 124 New Battery Technologies
- 108 Old Battery Tech Discussions
- 3.8K Solar News - Automatic Feed
- 3.8K Solar Energy News RSS Feed


