Re: Surge Protection Devices - Single Phase and Single Pole - WHY ?
> green wire ground and neutral are always at the same potential. They are close to the same potential until you have a lighting strike in the wrong place (eg, on the neutral line). Then they can …2 · -
Re: Off Grid which generator to chose 10 kVA to 15kVA
> we intend to implement AGS 2-wire start-stop control so options exist to stop the generator automatically Not going through absorb is usually bad for batteries. I understand the concern, but if …1 · -
Re: Split to California energy politics (from kWH Grid Solar)
> I think there should be a pricing model that signals users to put load on the grid. Absolutely. Skip right over fixed time of use models and go straight to this. It will reduce pollution and gri…2 · -
Re: Split to California energy politics (from kWH Grid Solar)
> There is nothing wrong with long term pricing When it is backed by long term costs. Otherwise, it creates a risk of bankruptcy - which would shift costs to the wrong people (like consumers).2 · -
Re: Multiple Charging Sources - Avoiding overcharge
During bulk, the electronic current controllers (#1 and #3) will automatically exactly match their voltages with each contributing as much as they can supply to charging current. During bulk, the bat…1 ·