Pole mounted arrays - Inter array conduit routing
HuckMeat
Registered Users Posts: 24 ✭
I'm getting ready to mount three pole mounted arrays, and fall under the 2008 NEC. Each array is mounted on an 8" SCH40 pipe.
1) How do I ground the pipe
2) Do I need to do a UFR at each array? There is a mess of rebar in the engineered foundations
3) For conduits between the arrays, is EMT OK for underground use? Rigid steel conduit? Or Sch80 PVC? Can both be routed through the concrete before I pour, and if so, do I need expansion joints (which would seem odd since the pole is in the same concrete). I figure I need an expansion joint at the house, but figured the horizontal exit from the pole mount foundation would allow vertical movement...
1) How do I ground the pipe
2) Do I need to do a UFR at each array? There is a mess of rebar in the engineered foundations
3) For conduits between the arrays, is EMT OK for underground use? Rigid steel conduit? Or Sch80 PVC? Can both be routed through the concrete before I pour, and if so, do I need expansion joints (which would seem odd since the pole is in the same concrete). I figure I need an expansion joint at the house, but figured the horizontal exit from the pole mount foundation would allow vertical movement...
Comments
-
Re: Pole mounted arrays - Inter array conduit routing
You will want to use pvc conduit between arrays and I usually run it in the concrete. -
Re: Pole mounted arrays - Inter array conduit routingI'm getting ready to mount three pole mounted arrays, and fall under the 2008 NEC. Each array is mounted on an 8" SCH40 pipe.
1) How do I ground the pipe
2) Do I need to do a UFR at each array? There is a mess of rebar in the engineered foundations
3) For conduits between the arrays, is EMT OK for underground use? Rigid steel conduit? Or Sch80 PVC? Can both be routed through the concrete before I pour, and if so, do I need expansion joints (which would seem odd since the pole is in the same concrete). I figure I need an expansion joint at the house, but figured the horizontal exit from the pole mount foundation would allow vertical movement...
1) I would place/drive a ground rod at each pole, and tie them together into a single common grounding system.
2) You can. If you do go with UFER, then yes, do one at each array.
3) EMT is NOT okay for underground - use rigid or PVC. I would go with PVC. Yes, you can run them underground before you pour. You don't need expansion joints to run the conduit out of one slab, through dirt and then into another slab. You do need them if the slabs are side-by-side.
Categories
- All Categories
- 222 Forum & Website
- 130 Solar Forum News and Announcements
- 1.3K Solar News, Reviews, & Product Announcements
- 192 Solar Information links & sources, event announcements
- 888 Solar Product Reviews & Opinions
- 254 Solar Skeptics, Hype, & Scams Corner
- 22.4K Solar Electric Power, Wind Power & Balance of System
- 3.5K General Solar Power Topics
- 6.7K Solar Beginners Corner
- 1K PV Installers Forum - NEC, Wiring, Installation
- 2K Advanced Solar Electric Technical Forum
- 5.5K Off Grid Solar & Battery Systems
- 425 Caravan, Recreational Vehicle, and Marine Power Systems
- 1.1K Grid Tie and Grid Interactive Systems
- 651 Solar Water Pumping
- 815 Wind Power Generation
- 624 Energy Use & Conservation
- 611 Discussion Forums/Café
- 304 In the Weeds--Member's Choice
- 75 Construction
- 124 New Battery Technologies
- 108 Old Battery Tech Discussions
- 3.8K Solar News - Automatic Feed
- 3.8K Solar Energy News RSS Feed