Re: Service Panel Upgrade Required?GreenerPower wrote: »So, for the OP, his choices are:
* Use 50A wire, normal 40A breaker and risk often nuisance trips
* Use "100% rated" 40A breaker and reduce the chance of nuisance trips. If the inverters backfed current is spec'ed to be maximum at 40A, then the chance of nuisance trip is close to nil. But I'm afraid that with 40A breaker, the inspectors would use J.Wiles articles and dictate 32A backfeed as limit on the PV/inverter.
* Use 50A breaker and replace the main 200A breaker down to 180A breaker (for inspectors that use "the code man" articles as their bible).
* Use a higher rated service panel
GP
You left out the sub-panel option.
Categories
- All Categories
- 228 Forum & Website
- 136 Solar Forum News and Announcements
- 1.3K Solar News, Reviews, & Product Announcements
- 199 Solar Information links & sources, event announcements
- 895 Solar Product Reviews & Opinions
- 255 Solar Skeptics, Hype, & Scams Corner
- 22.4K Solar Electric Power, Wind Power & Balance of System
- 3.5K General Solar Power Topics
- 6.7K Solar Beginners Corner
- 1K PV Installers Forum - NEC, Wiring, Installation
- 2.1K Advanced Solar Electric Technical Forum
- 5.6K Off Grid Solar & Battery Systems
- 428 Caravan, Recreational Vehicle, and Marine Power Systems
- 1.1K Grid Tie and Grid Interactive Systems
- 652 Solar Water Pumping
- 815 Wind Power Generation
- 624 Energy Use & Conservation
- 618 Discussion Forums/Café
- 311 In the Weeds--Member's Choice
- 75 Construction
- 124 New Battery Technologies
- 108 Old Battery Tech Discussions
- 3.8K Solar News - Automatic Feed
- 3.8K Solar Energy News RSS Feed