Portable Wind and solar hybrid offgrid

kewl0069
Registered Users Posts: 4 ✭
I built a portable wind and solar hybrid system that I tow behind my camper or truck and park anywhere I wish
And this monster powers anything i wish with out problems.i have a 4 300 watt solar panels with solar tracking system that can fold down like awning for transport and also 3 200 watt suitcases with folding legs total 600 watt array 120v systems 1200 watt array I have a 200v 100 amp EPEVER mppt controller PV input is 8 awg mc4 connects to copper bus bar then 1/0 awg temco welding cable to 80 amp 100 % duty cycle outback breaker 1/0 awg to pin type terminal into mppt controller then mppt controller battery connection to bus bar 2/0 temco welding cables to 125 amp 150v outback 100.% duty cycle breaker then to copper bus bar then 4/0 cable to battery bank far left negative terminal and far right positive terminal. The 600 watt array run is 8awg temco welding cable mc4 to copper bus bar 1/0 awg temco welding cables to 80 amp breaker midnight solar quad box then 1/0 to EPEVER 200v 80amp mppt controller then to parallel copper bus with 100 amp mppt controller then to 4/0 awg cable to battery bank. The custom box has a temperature controlled relay board that turns on cooling system inside this custom box it has 2 mt50 remote meters with out door see through covers. And also custom led lights hooked to bus bar and fused 5 amp fuse and rocker switch .the solar tracking system is a single axis east to west configuration using linear actuators and a custom prototype superstrut and emt pole system and cone nuts and brackets and square washers to mount solar panels it looks good and is tough.the system has 2 power inverters on the 1410 AH 12v bank made of 12 crown CR-235 6v deep cycle batteries and 12 inch 4/0 temco battery cables in parallel and series. I have an electronics box to that has a 1000 amp copper bus inside I have a far left positive cable 4/0 with gopower 400 amp ANL 7ft cable to bus from bank and far right negative connection 7ft 4/0 to bus . The 6kw 12kw msw inverter hardwire 50 amp port with 30 amp RV receptacle box 4 2ft 4/0 cables to bus and 3.5kw to 7.5kw puresine 2 4/0 cables 1ft to bus. 500 amp ANL fuse on positive side. 3 phase pull switch 6 awg x 3 Carol wire 60 ft from prototype wind turbine tower foldable telescoping tower .500 watt 3 phase wind turbine 5 blade and 3 blade .the switch handle is the 3x 6awg from turbine then 10 awg 3x carol 1 ft to 100 amp rectifier then to dump control board and solid state relay and a 300 watt 3 ohm resister bank. 2/0 4ft to bus bar and 4awg to dump 2 ft. 12v battery bank desulfinator and led lights inside with rocker switch.here is my YouTube channel showing the unit
https://youtu.be/OsLhXS_OvIU
https://youtu.be/vA6pi8aMUAM solar trackers
Night time wind turbine power input.
https://youtu.be/Ys_cP2cS7YI
Here is the inside of my solar controller box
https://youtu.be/EEjS9K-Q6B8
Here is an older video about the wind turbine tower I named it scorpion tower for patient.
https://youtu.be/S_AuPCd9rSM. I work on this all the time adding new stuff and upgrades and making changes or even redoing stuff better.let me know what you think.i am using this at home too I have an ATS and its saving some money on my Bill's too.
And this monster powers anything i wish with out problems.i have a 4 300 watt solar panels with solar tracking system that can fold down like awning for transport and also 3 200 watt suitcases with folding legs total 600 watt array 120v systems 1200 watt array I have a 200v 100 amp EPEVER mppt controller PV input is 8 awg mc4 connects to copper bus bar then 1/0 awg temco welding cable to 80 amp 100 % duty cycle outback breaker 1/0 awg to pin type terminal into mppt controller then mppt controller battery connection to bus bar 2/0 temco welding cables to 125 amp 150v outback 100.% duty cycle breaker then to copper bus bar then 4/0 cable to battery bank far left negative terminal and far right positive terminal. The 600 watt array run is 8awg temco welding cable mc4 to copper bus bar 1/0 awg temco welding cables to 80 amp breaker midnight solar quad box then 1/0 to EPEVER 200v 80amp mppt controller then to parallel copper bus with 100 amp mppt controller then to 4/0 awg cable to battery bank. The custom box has a temperature controlled relay board that turns on cooling system inside this custom box it has 2 mt50 remote meters with out door see through covers. And also custom led lights hooked to bus bar and fused 5 amp fuse and rocker switch .the solar tracking system is a single axis east to west configuration using linear actuators and a custom prototype superstrut and emt pole system and cone nuts and brackets and square washers to mount solar panels it looks good and is tough.the system has 2 power inverters on the 1410 AH 12v bank made of 12 crown CR-235 6v deep cycle batteries and 12 inch 4/0 temco battery cables in parallel and series. I have an electronics box to that has a 1000 amp copper bus inside I have a far left positive cable 4/0 with gopower 400 amp ANL 7ft cable to bus from bank and far right negative connection 7ft 4/0 to bus . The 6kw 12kw msw inverter hardwire 50 amp port with 30 amp RV receptacle box 4 2ft 4/0 cables to bus and 3.5kw to 7.5kw puresine 2 4/0 cables 1ft to bus. 500 amp ANL fuse on positive side. 3 phase pull switch 6 awg x 3 Carol wire 60 ft from prototype wind turbine tower foldable telescoping tower .500 watt 3 phase wind turbine 5 blade and 3 blade .the switch handle is the 3x 6awg from turbine then 10 awg 3x carol 1 ft to 100 amp rectifier then to dump control board and solid state relay and a 300 watt 3 ohm resister bank. 2/0 4ft to bus bar and 4awg to dump 2 ft. 12v battery bank desulfinator and led lights inside with rocker switch.here is my YouTube channel showing the unit


Night time wind turbine power input.

Here is the inside of my solar controller box

Here is an older video about the wind turbine tower I named it scorpion tower for patient.

Comments
-
I will make another video after I finish my upgrades. I have done allot since these videos the tracking system is about a week old its awesome. I ordered a wind speed sensor anemometer for it so the panels will park in high winds.
Categories
- All Categories
- 224 Forum & Website
- 132 Solar Forum News and Announcements
- 1.3K Solar News, Reviews, & Product Announcements
- 196 Solar Information links & sources, event announcements
- 894 Solar Product Reviews & Opinions
- 255 Solar Skeptics, Hype, & Scams Corner
- 22.4K Solar Electric Power, Wind Power & Balance of System
- 3.5K General Solar Power Topics
- 6.7K Solar Beginners Corner
- 1K PV Installers Forum - NEC, Wiring, Installation
- 2.1K Advanced Solar Electric Technical Forum
- 5.5K Off Grid Solar & Battery Systems
- 428 Caravan, Recreational Vehicle, and Marine Power Systems
- 1.1K Grid Tie and Grid Interactive Systems
- 652 Solar Water Pumping
- 815 Wind Power Generation
- 624 Energy Use & Conservation
- 617 Discussion Forums/Café
- 310 In the Weeds--Member's Choice
- 75 Construction
- 124 New Battery Technologies
- 108 Old Battery Tech Discussions
- 3.8K Solar News - Automatic Feed
- 3.8K Solar Energy News RSS Feed