Re: 110 Volt AC Water Well Setup (Off Grid)At the very least, it is recommended that batteries in series should be relatively close in AH capacity.
For testing, it is not going to hurt anything... For long term, you might have problems with equalization (some batteries may undercharge and others over charge in the string--depending on capacity, leakage current, etc.).
Equalization can make batteries all 100% charged--but it does this by overcharging some batteries to bring the "weak" ones back to 100% charge.
Over the long term, equalization is pretty hard on batteries and should only be done when needed (for example, when the range of specific gravity is 0.030 or greater from lowest to highest cell).
Normally equalization is done once every 1-3 months or so for flooded cell batteries. Some companies recommend equalization every 2-3 months, and others only equalize when needed.
-Bill
Ok Thanks this would only to be to test... Of course if and when I set this up I would get (4) 6 volt batteries.
Categories
- All Categories
- 222 Forum & Website
- 130 Solar Forum News and Announcements
- 1.3K Solar News, Reviews, & Product Announcements
- 194 Solar Information links & sources, event announcements
- 891 Solar Product Reviews & Opinions
- 255 Solar Skeptics, Hype, & Scams Corner
- 22.4K Solar Electric Power, Wind Power & Balance of System
- 3.5K General Solar Power Topics
- 6.7K Solar Beginners Corner
- 1K PV Installers Forum - NEC, Wiring, Installation
- 2.1K Advanced Solar Electric Technical Forum
- 5.5K Off Grid Solar & Battery Systems
- 427 Caravan, Recreational Vehicle, and Marine Power Systems
- 1.1K Grid Tie and Grid Interactive Systems
- 652 Solar Water Pumping
- 815 Wind Power Generation
- 624 Energy Use & Conservation
- 616 Discussion Forums/Café
- 309 In the Weeds--Member's Choice
- 75 Construction
- 124 New Battery Technologies
- 108 Old Battery Tech Discussions
- 3.8K Solar News - Automatic Feed
- 3.8K Solar Energy News RSS Feed