NEC 2014 Rapid Shutdown--Sunspec at start and end of array

Would a Sunspec module on the first and last panel of an array meet 2014? Rather than rapid shutdown modules on all panels. Any safety issues? Sunspec transmitter would be the latest SMA 5 kw inverter.