Solar panel production

Options
2»

Comments

  • Estragon
    Estragon Registered Users Posts: 4,496 ✭✭✭✭✭
    Options
    FWIW, I leave my solar charging when I'm not here, including break-up/ freeze-up when I can't really get here for ~2mos for each.  There are some risks to doing so, including water use.  So far it's worked out okay topping up before leaving, and setting skip days so batteries mostly float.
    Off-grid.  
    Main daytime system ~4kw panels into 2xMNClassic150 370ah 48v bank 2xOutback 3548 inverter 120v + 240v autotransformer
    Night system ~1kw panels into 1xMNClassic150 700ah 12v bank morningstar 300w inverter