Anyone else have or hear of a setup like this?
Solar hybrid gasoline generator, 7kw gas, 180 watts of solar, Morningstar 15 amp MPPT, group 31 AGM, 900 watt kisae inverter.
Solar roof top GMC suburban, a normal 3/4 ton suburban with 180 watts of panels on the roof and 10 amp genasun MPPT, 2000w samlex pure sine wave inverter, 12v gast and ARB air compressors.
Comments
-
Yes... Typically they "pay you" for the energy you generate and charge you for the energy you use... No "hidden" on-site energy usage (from what little I have seen).
Check the billing/rate plans. Some favor the customer, some do not. Also check connection fees (you now have two meters, two "bills", etc.).
-BillNear San Francisco California: 3.5kWatt Grid Tied Solar power system+small backup genset -
They're saying they don't charge any extra for the additional meter if you already pay for regular electrical service.
But I have to pay an electrician to install it.Solar hybrid gasoline generator, 7kw gas, 180 watts of solar, Morningstar 15 amp MPPT, group 31 AGM, 900 watt kisae inverter.
Solar roof top GMC suburban, a normal 3/4 ton suburban with 180 watts of panels on the roof and 10 amp genasun MPPT, 2000w samlex pure sine wave inverter, 12v gast and ARB air compressors.
-
Well it depends... Most meters made in the past 100 years will run backwards so there is no real need for a separate meter, however, they are not designed to run backwards so the Power Company wants to make sure that they aren't getting ripped off. My COOP provided a new meter, digital of course and remotely readable, that is made for net-metering (and of course I pay more for it each month!), the installation company also installed a "regular" mechanical meter just on the output of the panels (microverters), which really isn't necessary, but I guess I could check it against what the Power Company says I sent back to them, and of course I can look up online what the microverters are putting out.
Rancher -
The dumb smart meters count any power flow as consumption.
That way people can't turn the meter upside down and run them backwards or switch the wires in the panel to flow power backwards through the meter.
The old electromechanical meters do run backwards if you back feed them with power, wire them "backwards" or flip the meter upside down (if the meter has evenly spaced plug blades).
Dumb smart meters count any power flow as consumption, power coming, going, it doesn't matter. Put it in upsidedown or wire it backwards, it still counts up.
Any who, now it looks like I have to run any solar power I make all the way back to the 2nd meter box and I can't tie in and back feed like I planned.
This is why I added 2 more $120 each 12 space 24 circuit sub panels. I still needed 1 sub panel on the outside of the house and a bigger panel on my out building but I could have put in much smaller, cheaper sub panels, smaller wire and smaller cheaper breakers.
Luckily I didn't have an electrician to put them in and I was already planning to bury conduit between all the sub panels and solar panel areas.
I will probably put an additional 1/2 inch or 3/4 inch conduit down in the hole so I can run high voltage DC back to the service drop area.Solar hybrid gasoline generator, 7kw gas, 180 watts of solar, Morningstar 15 amp MPPT, group 31 AGM, 900 watt kisae inverter.
Solar roof top GMC suburban, a normal 3/4 ton suburban with 180 watts of panels on the roof and 10 amp genasun MPPT, 2000w samlex pure sine wave inverter, 12v gast and ARB air compressors.
-
I have a couple of meter boxes on my property I think I will go harvest them for this install so I don't have to buy a new one.
Looks like at one time there were a few trailers out there.Solar hybrid gasoline generator, 7kw gas, 180 watts of solar, Morningstar 15 amp MPPT, group 31 AGM, 900 watt kisae inverter.
Solar roof top GMC suburban, a normal 3/4 ton suburban with 180 watts of panels on the roof and 10 amp genasun MPPT, 2000w samlex pure sine wave inverter, 12v gast and ARB air compressors.
-
I talked to the coop electric engineer. When I talked to the meter shop it sounded like the solar power was back fed through its own service drop. (Maybe for large installs?)
They do require a second meter, but then it back feeds into the main breaker box like you would expect.
I think the 2 meter, 2 service drop setup is for large solar setups well over 10kw.
2 meter, 1 service drop is for residential.Solar hybrid gasoline generator, 7kw gas, 180 watts of solar, Morningstar 15 amp MPPT, group 31 AGM, 900 watt kisae inverter.
Solar roof top GMC suburban, a normal 3/4 ton suburban with 180 watts of panels on the roof and 10 amp genasun MPPT, 2000w samlex pure sine wave inverter, 12v gast and ARB air compressors.
Categories
- All Categories
- 222 Forum & Website
- 130 Solar Forum News and Announcements
- 1.3K Solar News, Reviews, & Product Announcements
- 192 Solar Information links & sources, event announcements
- 888 Solar Product Reviews & Opinions
- 254 Solar Skeptics, Hype, & Scams Corner
- 22.4K Solar Electric Power, Wind Power & Balance of System
- 3.5K General Solar Power Topics
- 6.7K Solar Beginners Corner
- 1K PV Installers Forum - NEC, Wiring, Installation
- 2K Advanced Solar Electric Technical Forum
- 5.5K Off Grid Solar & Battery Systems
- 425 Caravan, Recreational Vehicle, and Marine Power Systems
- 1.1K Grid Tie and Grid Interactive Systems
- 651 Solar Water Pumping
- 815 Wind Power Generation
- 624 Energy Use & Conservation
- 611 Discussion Forums/Café
- 304 In the Weeds--Member's Choice
- 75 Construction
- 124 New Battery Technologies
- 108 Old Battery Tech Discussions
- 3.8K Solar News - Automatic Feed
- 3.8K Solar Energy News RSS Feed