There is a huge Wind Turbine Farm that is nearing completion in Pauling and Van Wert Counties in Northwest Ohio. I drove past the turbines on Friday and about 50% of the wind turbines were turning with only 9-10mph winds. On Monday with 15mph winds about 80% of them were turning. The project is not 100% completed. Given the information provided I calculate that each wind turbine generates about $500,000 in electricity per year and each costs about $2 Million to install. Could "grid-sized" wind turbines actually be NET profitable ??? The turbines were manufactured in Pennsylvania, too! The project created 300 temporary construction / installation type jobs for about 1 year and 25-30 permanent jobs. Plus, there was a 30% Federal Tax Credit that made this project even more profitable for someone.
http://www.iberdrolarenewables.us/bluecreek/docs/primary/03-Appendices/AA-FactSheet/Blue-Creek-mini-fact-sheet-120809.pdf
http://www.ohio.com/news/local/wind-turbines-rise-above-flatlands-of-western-ohio-1.239271
http://www.iberdrolarenewables.us/bluecreek/docs/primary/03-Appendices/AA-FactSheet/Blue-Creek-mini-fact-sheet-120809.pdf
http://www.ohio.com/news/local/wind-turbines-rise-above-flatlands-of-western-ohio-1.239271
Comments
-
Re: 350 Megawatt Wind Turbine Farm in NW Ohio !
Thanks for noticing our efforts! The Blue Creek Wind Farm is a 304 MW wind farm, utilizing 152 Gamesa G90 2.0 MW wind turbines. There is a chance that we may be able to expand the project to the full 350 MW that we have reserved on the nearby 345 kV transmission line. You can read more about the project here: www.iberdrolarenewables.us/bluecreek.html.
The project is a significant source of green electricity (enough for 76,000 average Ohio households) and local economic development. We will become the largest single taxpayer in Van Wert County, equal to the current top 14 taxpayers combined. And we will also contribute to the local economy with landowner lease payments and new permanent jobs from our maintenance technicians. -
Re: 350 Megawatt Wind Turbine Farm in NW Ohio !
Welcome to the Forum "Blue Creek",
Not directly related to your wind farm--Are you guys working/contracting/looking at electrical power storage systems?
Even for us Solar Power users, the expensive and maintenance intensive part of off grid power has always been the battery bank.
-BillNear San Francisco California: 3.5kWatt Grid Tied Solar power system+small backup genset -
Re: 350 Megawatt Wind Turbine Farm in NW Ohio !
from blue creek w f,
"Thanks for noticing our efforts!"
i'll have to also give our thanks to you for noticing us and our efforts.:D
Categories
- All Categories
- 222 Forum & Website
- 130 Solar Forum News and Announcements
- 1.3K Solar News, Reviews, & Product Announcements
- 192 Solar Information links & sources, event announcements
- 888 Solar Product Reviews & Opinions
- 254 Solar Skeptics, Hype, & Scams Corner
- 22.4K Solar Electric Power, Wind Power & Balance of System
- 3.5K General Solar Power Topics
- 6.7K Solar Beginners Corner
- 1K PV Installers Forum - NEC, Wiring, Installation
- 2K Advanced Solar Electric Technical Forum
- 5.5K Off Grid Solar & Battery Systems
- 426 Caravan, Recreational Vehicle, and Marine Power Systems
- 1.1K Grid Tie and Grid Interactive Systems
- 651 Solar Water Pumping
- 815 Wind Power Generation
- 624 Energy Use & Conservation
- 611 Discussion Forums/Café
- 304 In the Weeds--Member's Choice
- 75 Construction
- 124 New Battery Technologies
- 108 Old Battery Tech Discussions
- 3.8K Solar News - Automatic Feed
- 3.8K Solar Energy News RSS Feed