Re: Placement of Automatic Transfer Switch for Grid-Tied Battery Back up System
I do not believe that is how the SI is designed (genset+ATS on AC1--protected load output). (Note that, it appears, that A1 is the protected sided of a SI, and A2 is the genset side--sort of backward…1 · -
Re: New build off-grid
Ok. Not sure of loads yet--Always recommend conservation over just making a larger system as being the most cost effective. Typically, off grid solar power costs around $1.00-$2.00+ per kWH when you …1 · -
Re: merging panels. old and new
28 amps × 14.0 volts = 392 watts.... Getting there. -Bill1 · -
Re: Is The Party Over?
Back in 2013 or so, California gave "Point$" to electric vehicles that could recharge in less than 15 minutes--Tesla did some dog and pony show that get them the points because they could d…1 · -
Re: Is The Party Over?
Governments are going to run out of other peoples monies (some already have such as Spain) and there will be a collapse in much of the green energy market: https://wattsupwiththat.com/2017/09/23/germ…1 ·