New Program Solves the Stranded Solar Meter Problem for California Farms

Options
RSSfeed
RSSfeed Registered Users Posts: 3,810 ✭✭
feature-0-1400535354265.jpg SB 594, a law that went into effect in PG&E utility territory February 2014, now allows property owners to aggregate the electricity load of multiple utility meters scattered throughout a single parcel or multiple continuous parcels and credit the bills with a single “Net Metered” installation.* This new program is called ‘Net Meter Aggregation’ an

More...

Comments

  • vtmaps
    vtmaps Solar Expert Posts: 3,741 ✭✭✭✭
    Options
    Re: New Program Solves the Stranded Solar Meter Problem for California Farms
    RSSfeed wrote: »
    SB 594, a law that went into effect in PG&E utility territory February 2014, now allows property owners to aggregate the electricity load of multiple utility meters scattered throughout a single parcel or multiple continuous parcels and credit the bills with a single “Net Metered” installation.* This new program is called ‘Net Meter Aggregation’ an

    In Vermont the parcels do not have to be contiguous :cool:
    --vtMaps
    4 X 235watt Samsung, Midnite ePanel, Outback VFX3524 FM60 & mate, 4 Interstate L16, trimetric, Honda eu2000i