EMT conduit attach to Unirac rails
System
Posts: 2,511 admin
We run 3 ft EMT conduit from DC Disconnect to to unirac frames we attach emt pipe to frame with single strap using metal screw, inspector doesn't like our emt to be in contact with aluminum frame. Inside the emt we have 2 use no 10 wire and one #10 cooper solid wire. You meet this issue before ?
Comments
-
Re: EMT conduit attach to Unirac rails
Yes, I feel your pain. Our general strategy is to just do whatever the inspector wants (Ya, masser) and after awhile they get to know you and lay off with all the stupid stuff.
Categories
- All Categories
- 243 Forum & Website
- 150 Solar Forum News and Announcements
- 1.4K Solar News, Reviews, & Product Announcements
- 189 Solar Information links & sources, event announcements
- 918 Solar Product Reviews & Opinions
- 256 Solar Skeptics, Hype, & Scams Corner
- 22.5K Solar Electric Power, Wind Power & Balance of System
- 3.5K General Solar Power Topics
- 6.7K Solar Beginners Corner
- 1K PV Installers Forum - NEC, Wiring, Installation
- 2.1K Advanced Solar Electric Technical Forum
- 5.5K Off Grid Solar & Battery Systems
- 438 Caravan, Recreational Vehicle, and Marine Power Systems
- 1.1K Grid Tie and Grid Interactive Systems
- 652 Solar Water Pumping
- 829 Wind Power Generation
- 625 Energy Use & Conservation
- 624 Discussion Forums/Café
- 301 In the Weeds--Member's Choice
- 91 Construction
- 124 New Battery Technologies
- 108 Old Battery Tech Discussions
- 3.8K Solar News - Automatic Feed
- 3.8K Solar Energy News RSS Feed