True Up Bill

southforksouthfork Posts: 27Registered Users ✭✭
With record rain fall amounts and raining as I type my net energy metering (NEM) summary was in the mail . Total NEM charges Due $0.00 and a credit for Net Surplus Compensation (NSC) $14.04 not bad for a wet winter .
 24 solar world 285 watt panels with 24 Enphase 250 s ground mount grid tied .                                                                

Comments

  • BB.BB. Posts: 27,785Super Moderators admin
    Congratulations.

    -Bill
    Near San Francisco California: 3.5kWatt Grid Tied Solar power system+small backup genset
  • jonrjonr Posts: 1,066Solar Expert ✭✭✭✭
    Free battery service! (for you, not so free for your non-solar neighbors).
Sign In or Register to comment.